  • Survey and leveling operations of raising and widening flood banks to 1986 standards in Godavari headworks division for Vynatheyam left flood bank from KM 0.000 to KM 28.500

    Conducting detailed investigation with total station such as longitudinal survey for fixing alignment, cross sectional levels at 100 mtr intervals along flood bank to a length of 50 mtr land side and 100 mtr river side of alignment at 5 mtr intervals, chain survey with prismatic compass and check levels including preparation of line estimates at 500 mtr intervals and detailed estimates at 100 mtr interval cross section with plans and required drawings by computerization method and as directed by Engineer-in-Charge.