Back
Projects
-
Proposed Small Hydel Power Scheme, 2 x 1.50 MW on Akkampally Balancing Reservoir. Near Akkampally Village, Pedda Adiserlapally Mandal, Nalgonda District, Telangana State
The proposed hydel scheme is a canal based scheme, which utilized the releases for drinking and irrigation purpose released water from Akkampally Balancing Reservoir (AKBR). The head availability is there due to level difference in Reservoir and the canal. Based on study a net head of 11.2 mtr is available. The discharge of 35 cumecs is available during irrigation period of 120 days and during remaining period 10 cumecs of discharge is available. Based on discharge and head availability, two units each of 1.5 MW capacity are proposed at the site.
The developer is M/s Pakeeza Infrastructure Development Company Private Limited.