Back

Projects

  • Proposed Small Hydel Power Scheme, 2 x 1.50 MW on Akkampally Balancing Reservoir. Near Akkampally Village, Pedda Adiserlapally Mandal, Nalgonda District, Telangana State

    The proposed hydel scheme is a canal based scheme, which utilized the releases for drinking and irrigation purpose released water from Akkampally Balancing Reservoir (AKBR). The head availability is there due to level difference in Reservoir and the canal. Based on study a net head of 11.2 mtr is available. The discharge of 35 cumecs is available during irrigation period of 120 days and during remaining period 10 cumecs of discharge is available. Based on discharge and head availability, two units each of 1.5 MW capacity are proposed at the site.
     
    The developer is M/s Pakeeza Infrastructure Development Company Private Limited.

Irrigation Sector

Hydro Power Sector

Advisory Services

Second Opinion

Engineering Services

Project Management

Client Details

Project Details

Other Important Works