  • Run -of-the-river Hydro Electric Project of proposed capacity 280 MW (7 x 40 MW) across river Godavari at Kanthanapally


    Kanthanapally HEP

    The objective of the Detailed Project Report (DPR) is prepared for developing a run -of-river hydroelectric power project by utilizing the head created by construction of a gravity  dam  across river  Godavari  at Kantanapally village, Warangal district in Andhra Pradesh for APGENCO. The study aims at providing the best and most suitable option and specify the design features for optimum overall river basin development of the river for power generation.
    The Detailed Project Report (DPR) is being prepared by ConTec in line with the Guidelines laid down by Central Electricity Authority (CEA) for formulation of Detailed Project Report (DPR)s for Hydro Electric Schemes, in compliance with  the requirement of Section 8 of the Electricity Act, 2003.
    The work is done for Andhra Pradesh Power Generation Corporation (APGENCO). 

Irrigation Sector

Hydro Power Sector

Advisory Services

Second Opinion

Engineering Services

Project Management

Client Details

Project Details

Other Important Works