  • Handri Neeva Sujala Sravanthi (HNSS) Project for Kurnool, Ananthapur, Chittoor and Kadapah, Andhra Pradesh


    HNSS Project

    The Handri Neeva Sujala Sravanthi (HNSS) scheme envisages to draw 40TMc of flood water of Krishna river from the foreshore of the Srisailam reservoir in 120 flood days during the period of 04 months from August to November to provide irrigation facilities in the 04 districts of Andhra Pradesh Kurnool, Ananthapur, Chittoor and Cuddapah in addition to providing drinking water facilities. The Phase- I civil works are divided into 14 nos. packages. Eight numbers of balancing reservoirs are proposed under the scheme to store water as per requirement. These reservoirs help in moderating the peak discharges in the canal systems and to store drinking water at the end of crop period for supply during the summer period. Pattikonda balancing reservoir is one of them. 
1.1
  • Head works IN HNSS Project


    Head Works, HNSS Project

    Pattikonda Balancing Reservoir (HNSS Phase I, Package 29)
    The present project falls under package no. 29, which deals with Pattikonda balancing reservoir and distribution system to feed an ayacut of 32,200 Acres of Khariff I.D. ConTec has designed headworks for the reservoir which includes earth dam, surplus weir, left bank sluice, right bank sluice and other appurtenant works. The work was done by ConTec for M/s Rajanikant A. Patil for the EPC group, M/s R.M. Mohite & Co., Bhooratnam  Construction Co., Pvt. Ltd (JV).
1.2
  • Cross Masonry and Cross Drainge Works in HNSS Project

1.2.a
  • Main Canal (HNSS Phase I, Package 23)

    Design of some cross masonry and cross drainage structures across main canal from Km -3.420 to Km 20 were carried out by ConTec for M/s Rithwik Projects Limited for the EPC agency, M/s Back bone Projects. 
1.2.b
  • Main Canal (HNSS Phase I, Package 32)

    Design of some cross masonry and cross drainage structures across Canal and HNSS Project Phase I from Km 155.000 to Km 176.425 (21.425 Kms) were carried out by ConTec for M/s Rithwik Projects Limited for the EPC agency, M/s Back bone Projects.
1.2.c
  • Main Canal (HNSS Phase I, Package 14)

    ConTec has designed various cross masonry and cross drainage works under main canal phase II, package 14 (Km 400.000 to Km 444.000) for M/s Sree sai sreenivasa Constructions pvt. Ltd. for the EPC agency, M/s Lanco Infra Tech Ltd. 
1.2.d
  • Main Canal (HNSS Phase I, Package 18)

    ConTec has designed various cross masonry and cross drainage works under main canal phase II, package 18 (Km 463.000 to Km 490.000) for Sree sai sreenivasa Constructions pvt. Ltd. for the EPC agency, M/s Back Bone Projects Limited. 