Back

Projects

  • Survey works for Lower Sileru Forebay reservoir Small Hydel Scheme, 3 x 1.334 MW

    Grid survey within and Left Bank of Forebay Reservoir of Lower Sileru Hydro Power Works from the existing walkway bridge up to a length of 600 mtr downstream for deciding the layout of Ungated Auxiliary Spillway.

Irrigation Sector

Hydro Power Sector

Advisory Services

Second Opinion

Engineering Services

Project Management

Client Details

Project Details

Other Important Works