Back

Projects

  • Run-of-the-river Hydro Electric Project of proposed capacity 320 MW (8 x 40 MW) across river Godavari at Dummugudem


    Dummugudem HEP

    The Detailed Project Report (DPR) is prepared for developing a 320 Mw run -of-river hydroelectric power project by constructing a gravity dam across River Godavari at Dummugudem village, Khammam district in Andhra Pradesh for APGENCO. The Detailed Project Report (DPR) is prepared by ConTec in line with the Guidelines laid down by Central Electricity Authority (CEA) for formulation of Detailed Project Report (DPR)s for Hydro Electric Schemes, in compliance with the requirement of Section 8 of the Electricity Act, 2003.
    The 2500 Cr. project envisages construction of a gated spillway in the deepest course of River Godavari, sandwiched between concrete overflow sections (auxiliary spillways), with a bridge proposed to connect with the earth and rock fill dam on both sides to pass a design discharge of about 1,00,000 cumecs. The power house is located within the concrete non overflow section on the right bank immediately after the right concrete overflow section. The work is done for Andhra Pradesh Power Generation Corporation (APGENCO).


Irrigation Sector

Hydro Power Sector

Advisory Services

Second Opinion

Engineering Services

Project Management

Client Details

Project Details

Other Important Works